References

TBILISI INTERNATIONAL AIRPORT ADDITIONAL TERMINAL BUILDING

01 January 2017 - 25 April 2017

Georgia | TAV&Arabtec JV.

Subcontracting of Metal Roof Cladding works as a whole

Main Products from our suppliers,
ISCOM Riverclack 50,000 m2
Hoesch Bausysteme, T,100.1 A (Perforated Trapezodial) 7,500 m2

 

ANKARA HIGH SPEED TRAIN STATION NEW TERMINAL BUILDING

01 September 2015 - 23 July 2015

Ankara | CLK (Cengiz-Limak-Kolin) Ortak Girişimi

Contractor-Vendor of metal roof covering works as whole.

Main products from our suppliers:

 

 

ISCOM RiverClack55®                                                   25,500 m²

 

Hoesch Bausysteme, T,100.1 A (Perforated Trapezodial)        25,500 m²

MADINAH INTERNATIONAL AIRPORT NEW TERMINAL BUILDING

01 September 2014 - 01 January 2015

Madinah | TAV-ACC VENTURE

Sub-contracting of metal roof covering works, skylights, roof eave covers as a whole.

Main Products from our suppliers:

ISCOM RiverClack 55®                                            92,500 m²

Hoesch Bausysteme,K 130/600.1A (Liner Tray)      56,000 m²

Hoesch Bausysteme,K 130/600.1   (Liner Tray)      17,500 m²

Hoesch Bausysteme,T 135.1                                  11,500 m²

Hoesch Bausysteme,K  35.1                                   5,250 m²

 

MYRIA HOTEL GATEHOUSE PROJECT

10 September 2014 - 18 December 2014

Ukraine | MetalYapi Inc.

Vendor of below materials and Supervisory

Main products from our suppliers:

ISCOM RiverClack 55®                         200m²

İZMİR AIRPORT DOMESTIC TERMINAL BUILDING

01 October 2013 - 10 March 2014

İZMİR | TAV CONSTRUCTION

Subcontracting of Metal Roof Cladding works as a whole
Main Products from our suppliers:
ISCOM RiverClack 55® 30,000 m²
Hoesch Bausysteme Gmbh Liner Tray,      K 120/600.1 A
13,000 m²


PULKOVO INTERNATIONAL AIRPORT TERMINAL BUILDING

01 October 2012 - 10 July 2013

St. Petersburg-Russia | IC Ictas- Astaldi

Subcontracting of Metal Roof Cladding works as a whole

Main Products from our suppliers
ISCOM Riverclack 50,000 m2
PRISHTINA INTERNATIONAL AIRPORT

10 August 2012 - 30 November 2012

Pristina- Kosovo | Limak Corporation

 

Subcontracting of Metal Roof Cladding works as a whole

Main Products from our suppliers
ISCOM Riverclack 14,300 m2
Hoesch Bausysteme Gmbh T 160.1.A 14,300 m2
SINPAS SALES OFFICE

01 February 2012 - 31 May 2012

Ankara | Sinpas Contruction

Subcontracting of Metal Cladding works

Main Products from our suppliers
ISCOM Riverclack 2,200 m2

GALATASARAY FACILITIES

01 April 2012 - 30 April 2012

Kalamis- İstanbul | Galatasaray Sports Club

Subcontracting of Metal Roof Cladding works as a whole

Main Products from our suppliers
ISCOM Riverclack 1,200 m2
Hoesch Bausysteme Gmbh T 85.1 1,200 m2
ALEXANDER THE GREAT" INTERNATIONAL AIRPORT

01 January 2011 - 01 June 2011

SKOPJE- MACEDONIA | TAV

 

Subcontracting of Metal Roof Cladding works as a whole
Main Products from our suppliers
ISCOM Riverclack 24,500 m2
Hoesch Bausysteme Gmbh T 85.1 24,500 m2
HAYDAR ALIYEV CONGRESS CENTER

01 January 2010 - 01 March 2010

BAKU- AZARBAIJAN | KONİKÜRE- LİMİT MÜH.

Vendor of below materials
Main products from our suppliers:
Hoesch Bausysteme Gmbh, T100.1 Trapezoidal Profile      31,000m2
ATATURK AIRPORT TERMINAL BUILDING (Extention)

- 01 September 2009

Yeşilköy-Istanbul | TAV Istanbul

Sub-contracting of metal roof covering works as a whole.

Main products from our suppliers:

ISCOM Riverclack55® 2,000 m²
SABIHA GOKCEN AIRPORT TERMINAL BUILDING

- 01 August 2009

Kurtköy-Istanbul | LIMAK – GMR JV

Sub-contracting of metal roof covering works as a whole.
Main products from our suppliers:
ISCOM RiverClack 55® 43,500 m²
Hoesch Bausysteme Gmbh Roof System  2000® Acoustical                        
43,500 m²

 

ZINE EL ABIDIN BEN ALI AIRPORT TERMINAL BUILDING

- 01 July 2009

Enfidha, TUNISIA | TAV Tunisia Tunus

 

Sub-contracting of metal roof covering works as a whole.

Main products from our suppliers:

ISCOM Riverclack55® 26,000 m²

Hoesch Bausysteme Gmbh, T35.1 Trapezoidal Profile   26,000 m²

THYSSENKRUPP EURINOX SERVICE CENTER

- 01 June 2009

Izmit | ThyssenKrupp Eurinox, Istanbul

Main-contracting on “Turn Key” basis, 20,000 sqm Industrial Building

TBILISI AIRPORT TERMINAL BUILDING

- 04 August 2008

Tbilisi, GEORGIA | TAV URBAN

Sub-contracting of the replacement of metal roof covering works as a whole.

Main products from our suppliers:

ISCOM Riverclack55® 11,000 m²

Hoesch Bausysteme Gmbh, T85.1 Trapezoidal Profile  4,400 m²

ANSE SHOPPING MALL

- 03 August 2008

Ankara | Anse Isletmecilik A.S.

Sub-contracting of metal roof covering works as a whole.

Main products from our suppliers:

ISCOM Riverclack55® 3,000 m²
ASELSAN INC. MILITARY BUILDINGS

- 02 August 2008

Ankara | BIRTAM Construction Ltd.

Vendor of below materials.

Main products from our suppliers:

ISCOM Riverclack55® 2,700 m²
ASELSAN INC. MILITARY BUILDINGS

- 01 August 2008

Ankara | OPTIMUM Construction Ltd.

Vendor of below materials.

Main products from our suppliers:

ISCOM Riverclack55® 4,700 m²
KADIR HAS CONGRESS CENTER

- 01 September 2007

Kayseri | Kahraman Insaat Co. Ltd.

Sub-contracting of metal roof covering works as a whole.

Main products from our suppliers:

ISCOM Riverclack55® 4,400 m²

Hoesch Bausysteme Gmbh, Acoustical Trapezoidal Profile 4,400 m²

ANTARES SHOPPING MALL

- 01 August 2007

Ankara | Dolunay Ormancilik Co. Ltd.

 

Supervising and supplying of metal roof covering works as a whole.

Main products from our suppliers:

ISCOM Riverclack55® 30,000 m²

Hoesch Bausysteme Gmbh, T85.1 Trapezoidal Profile 30,000 m²

UMRAN BORU INC. PRODUCTION PLANT

- 01 August 2006

Bartın | UMRAN Inc.

Vendor of below materials.

Main products from our suppliers:

Hoesch Bausysteme Gmbh, T35.1 Trapezoidal Profile 23,750 m²
ESENBOGA AIRPORT TERMINAL BUILDING

- 01 September 2005

Ankara | TAV Anatolia Inc.

Sub-contracting of metal roof covering works as a whole.

Main products from our suppliers:

ISCOM Riverclack55® 42,000 m²

Hoesch Bausysteme Gmbh, Roof  System 2000® 23,500 m²

TOYRAN INC. ICE HOKEY HALL

- 01 August 2005

Ashgabad, TURKMENISTAN | TOYRAN Inc.

Sub-contracting of metal roof covering works as a whole.

Main products from our suppliers:

ISCOM Riverclack55® 3,760 m²

ThyssenKrupp Hoesch, Roof  System 2000® 3,760 m²

UMUR INC. PRODUCTION PLANT

- 01 July 2005

Istanbul | KONIKURE Ltd.

Vendor of below materials.

Main products from our suppliers:

ISCOM Rivergrip® 9,000 m²
GAP-URFA AIRPORT TERMINAL BUILDING

- 08 August 2004

Urfa | GUNAY Construction Ltd.

Vendor of below materials.

Main products from our suppliers:

ISCOM Riverclack55® 9,000 m²

ThyssenKrupp Hoesch, T 100.1 Trapezoidal Profile  8,800 m²

ThyssenKrupp Hoesch, Additive Floor System® 3,500 m²

GELAL INC. PRODUCTION PLANT

- 07 August 2004

Istanbul | GELAL Inc.

Vendor of below materials.

Main products from our suppliers:

ISCOM Riverclack55® 8,000 m²

Hoesch Bausysteme Gmbh, T 135.1 Trapezoidal Profile 8,000 m²

ANADOLU VAKFI HOSPITAL

- 06 August 2004

Istanbul | KONIKURE Ltd.

Vendor of below materials.

Main products from our suppliers:

ISCOM Riverclack55® 2,800 m²
MOPISAN INC. PRODUCTION PLANT

- 04 August 2004

Izmir | MOPISAN Inc.

Vendor of below materials.
Main products from our suppliers:
Hoesch Bausysteme Gmbh, Isowand Sandwich Panels
3,350 m²
Hoesch Bausysteme Gmbh, Isowelle Sandwich Panels 470 m²
OGUZ AMBALAGE INC. PRODUCTION PLANT

- 01 August 2004

Istanbul | Oguz Ambalage

Vendor of below materials.

Main products from our suppliers:

Hoesch Bausysteme Gmbh, Isowand Sandwich Panels 2,000 m²

Hoesch Bausysteme Gmbh, Isowelle Sandwich Panels        350 m²

ARSLANLI INC. PRODUCTION PLANT

- 02 August 2002

Istanbul | ARSLANLI Inc.

Sub-contracting of metal roof covering works as a whole.
Main products from our suppliers:
ISCOM RiverClack 55® 2,400 m²
Hoesch Bausysteme Gmbh Roof System  2000®
2,400 m²
CIMTAS PIPE PRODUCTION PLANT

- 01 August 2002

Bursa | CIMTAS Inc.

Vendor of below materials.

Main products from our suppliers:

Hoesch Bausysteme Gmbh Isorock Facade System® 6,400 m²

 

Hoesch Bausysteme Gmbh, T50.1 Trapez Roofing Profile   8,600 m²

Hoesch Bausysteme Gmbh, T35.1 Trapez Roof Liner Profile   8,500 m²

S.H.C.E.K. CHILDREN CARE (FOSTER) HOUSE

- 03 August 2001

Sakarya | ThyssenKrupp Inc., Germany

Main-contracting of a steel structured building, from foundation to furnishment.

SABIHA GOKCEN AIRPORT TERMINAL BUILDING

- 03 August 2000

Istanbul | ALSIM ALARKO Inc.

Sub-contracting of metal roof covering works as a whole.
Main products from our suppliers:
ISCOM Riverclack 55® 27,000 m²
Hoesch Bausysteme Gmbh Roof System  2000® Acoustical                        
18,500 m

Hoesch Bausysteme Gmbh, Circular/Plane Eave System  5,700 m²

ERZURUM AIRPORT TERMINAL BUILDING

- 02 August 2000

Erzurum | AKSAL Inc.

Vendor of below materials.

Main products from our suppliers:

Hoesch Bausysteme Gmbh Additive Floor System® 7,850 m²
ATATURK AIRPORT TERMINAL BUILDING

- 03 August 1999

Istanbul | TAV Istanbul Inc.

Sub-contracting of metal roof covering works as a whole.
Main products from our suppliers:
ISCOM Rivergrip® 29,100 m²
ISCOM Riverclack55® 8,230 m²
DIYARBAKIR AIRPORT TERMINAL BUILDING

- 02 August 1999

Diyarbakır | ARYAPI Inc.

 

 

Vendor of below materials.

Main products from our suppliers:

ISCOM Rivergrip®

4,200 m²

Hoesch Bausysteme Gmbh Roof System 2000® 4,200 m²

ASELSAN INC. MILITARY BUILDINGS

- 01 August 1999

Ankara | ASELSAN Inc.

Vendor of below materials.
Main products from our suppliers:
ISCOM Rivergrip® 11,100 m²
BODRUM AIRPORT TERMINAL BUILDING

- 01 August 1997

Bodrum | PREKONS Inc.

Vendor of below materials.
Main products from our suppliers:
ISCOM Rivergrip® 16,000 m²
Hoesch Bausysteme Gmbh, Additive Floor System® 6,500 m²